Lower Lake Safety PID Phase 01-0Q910

This safety project adds safety improvements and lighting elements at strategic locations at the State Route (SR) 29 and SR-53 intersection as well as along SR-53 in the community of Lower Lake.

Project Description: 

Lower Lake Safety project aims to improve safety for everyone who uses the road. Potential changes include:

  • Narrow vehicle lanes from 12 feet to 11 feet.

  • Add space on the shoulder for people walking and riding bikes.

  • Add lighting to make it easier to see at night.

  • Add sidewalks.

  • Add two crosswalks with pedestrian hybrid beacons (PHB). The PHBs will show red lights for drivers when pedestrians push the buttons to cross the highway.

  • Upgrade guardrail to current standards.

  • Add rumble strip on the shoulder to alert drivers when they drift out of the lane.

  • Add raised concrete medians to slow drivers. This could make crossing the street easier for people who are walking.

Purpose:

The purpose of this project is to improve safety for all road users and to reduce the frequency and severity of collisions occurring within the project limits.

Need:

This project was initiated in response to Traffic Investigation Report (TIR) 231-0012MZ. The TIR reported 1 fatal and 3 serious injury collisions out of 16 total collisions within the two years from January 2019 to December 2020. Collisions in the dark account for 9 of the 16 collisions. The TIR recommended speed management elements.

Map: 

Map of the 0Q910 project's beginning and end points.

 

Funding: 

This project will request funding from the State Highway Operation and Protection Program (SHOPP).  

 

Project Timeline

live
live

Project Initiation

January 2026 - November 2026

planned
planned

Project Approval and Environmental Document

January 2028

planned
planned

Final Project Design

May 2029

planned
planned

Construction

January 2034