Red Rock to Doyle Safety Project

Red Rock to Doyle Safety Project

United States Route 395 (US 395) in Lassen County is undergoing a series of transformative projects designed to improve safety, modernize infrastructure, and support local and regional growth.

Overview

 

Public Meeting Flyer

Public Meeting & Comment Period

Your Voice Matters!

Caltrans invites you to participate in the environmental review process for this project. A Notice of Preparation (NOP) has been issued to let agencies, organizations, and community members know that an Environmental Impact Report (EIR) will be prepared.

Community input is an important part of this process. We encourage you to share your thoughts, questions, and concerns about the project and the environmental issues you believe should be considered as part of the environmental review.

https://dot.ca.gov/caltrans-near-me/district-3/d3-programs/d3-environmental/d3-environmental-docs/d3-lassen-county

Join Us for a Public Meeting

Monday, October 19, 2026
4:30–6:30 p.m.
Doyle Community Center
434-685 Doyle Loop
Doyle, CA 96113

Caltrans will provide a brief overview of the project and explain the environmental review process. Community members will also have an opportunity to learn more about the project and ask questions.

You do not need to attend the meeting to submit a comment.

Please note that questions and discussions during the public meeting are not considered formal comments on the environmental document. To ensure your comments are included as part of the environmental review process, they must be submitted in writing by email or mail.

Share Your Comments

We want to hear from you. Written comments on the project and its environmental review must be received by:

November 12, 2026

Comments may be submitted by either of the following methods:

By Email:
Red_Rock_to_Doyle_ScopingComments@dot.ca.gov

By Mail:
Caltrans District 2

Attn: Julie McFall

1031 Butte Street, MS 30

Redding, CA 96001

When submitting comments, please include the project name in the subject line or correspondence.

 

Project Location: 

The project is located on Highway 395 and begins near Hallelujah Junction and extends slightly past the Doyle Wildlife Area, post miles (PM) R5.60-R29.90.  See the Project Location Map below. 

Vicinity Map

Project Overview

The purpose of this project is to reduce the frequency and severity of crossover collisions, reduce distressed lane miles, improve ride quality, and minimize future maintenance and capital efforts and costs. This project would extend the useful pavement life for a minimum of 10 years and improve safety and facility reliability for all modes of travel/goods movement, and would restore pavement, culverts, bridges, guardrails, and Transportation Management System elements to a good condition. To address the crossover collisions occurring within the project limits, Caltrans is considering two build alternatives:

 Alternative 1 - Alternating Slow Moving Vehicle Lanes: Under this alternative, alternating slow moving vehicle lanes (1.5 to 3 miles long) would be constructed along the northbound and southbound travel way.

 Alternative 2 – Concrete Median Barrier: Under this alternative, northbound and southbound traffic would be separated by a 42-inch-tall concrete barrier.

Project Timeline

Project Timeline

complete
complete

Project Initiation

Caltrans works to develop the Project Initiation Document (PID) to define the project's scope, cost, and schedule. 

live
live

Project Approval and Environmental Document (PA&ED)

The project team is working on the project design and Environmental Document; evaluating project alternatives, assessing environmental and community impacts, and selecting the preferred alternative that balances transportation needs and environmental requirements.

planned
planned

Plan, Specifications and Estimates (PS&E)

PS&E is the final design stage for a Caltrans project before it is advertised for construction bids. The project team finalizes design decisions, incorporates environmental commitments, and identifies construction methods; completing the detailed documents needed to explain how the project will be built.

planned
planned

Construction

Construction anticipated 2030-2031

During the construction phase, Caltrans turns approved project plans into a completed transportation project. Caltrans staff, led by the resident engineer, oversee the contractor’s work and help ensure that construction follows the approved plans, specifications, schedule, and safety requirements. Overall, the construction phase is a carefully managed process that helps ensure a project is built safely, meets environmental and quality standards, stays within its approved scope, and is completed as planned.

Caltrans makes every attempt to ensure our documents are accessible. Due to variances between assistive technologies, there may be portions of documents which are not accessible. Where documents cannot be made accessible, we are committed to providing alternative access to the content. Should you need additional assistance, please contact us at (916) 654-2852 or visit https://dot.ca.gov/request-ada-compliant-documents.