Skip Navigation

Roundabout at State Route (SR) - 138 & 106th Street East Project

Roundabout at State Route (SR) - 138 & 106th Street East Project

Caltrans District 7 is proposing safety improvements at SR -138 and 106th Street East between Littlerock and Pearblossom. The project will reduce collisions and improve operations through a two-lane roundabout, a restricted crossing U-turn (RCUT) at Hempel Avenue, and enhanced signage and safety features.

 

Events

MAY 13
Wed, May 13 6:00 PM - 7:00 PM

Please join Caltrans to learn more about the Roundabout at LA-138 and 106th East Street Project.

MICROSOFT TEAMS

Link: Click this link to join
Meeting ID: 287 174 364 134 80
Passcode: re2An9nA

Dial in by Phone:

+1 279-895-7250,,466891006# United States, Sacramento
Find a local number
Phone conference ID: 466 891 006#

Join on a video conferencing device:

Tenant key: cadot@m.webex.com
Video ID: 117 703 046 0
More info


If you're unable to attend the virtual meeting, you can still provide us with your feedback via email or voicemail (details below):

 

Email: roundabout_la138_106st@publicinput.com

Voicemail: 855-925-2801, meeting code: 7703

 
No files added yet.

Thanks for your interest! Registration is closed because the event has concluded.

Overview

PROJECT DESCRIPTION


Caltrans District 7 is proposing traffic safety and operational improvements at the intersection of State Route (SR) 138 and 106th Street East, located between the communities of Littlerock and Pearblossom in Los Angeles County. This project is being developed to address a history of collisions at the intersection, particularly angle collisions involving vehicles entering or crossing SR-138 from 106th East Street. The corridor serves as a key regional route with high traffic volumes, including a significant number of trucks traveling between Interstate 5 and inland destinations such as Barstow, Victorville, and San Bernardino County.

Based on recommendations from the Intersection Safety and Operational Assessment Process (ISOAP), the project proposes to install a two-lane roundabout at SR-138 and 106th Street East, along with a restricted crossing U-turn (RCUT) at the intersection of SR-138 and Hempel Avenue. Additional improvements may include flashing beacons, signage, and other safety enhancements designed to improve driver awareness and traffic flow. The project area is characterized by a rural setting with a mix of highway and local traffic, where SR-138 transitions from a multi-lane facility to a narrower configuration.

These improvements aim to enhance safety, reduce conflict points, and improve overall traffic operations along this corridor. Caltrans will continue to evaluate project design and share information with the public as the project advances.

PROJECT INITIATION DOCUMENT  PHASE

This project is currently in the Project Initiation Document (PID) phase, where Caltrans District 7 defines the project purpose and need, evaluates alternatives, and develops preliminary scope, cost, and schedule. 

 

 
 

MAP OF PROJECT AREA

CURRENT INTERSECTION CONDITIONS  


Looking East 



Looking West

 

PROPOSED IMPROVEMENTS

Roundabout 

The proposed improvement would construct a two-lane roundabout at the intersection of LA-138 and 106th Street East to improve traffic flow and reduce conflict points.  The project would also include a Restricted Crossing U-turn (RCUT) at the nearby intersection of SR-138 and Hempel Avenue, along with flashing beacons, updated signage, and roadway striping to alert drivers and improve overall safety along the corridor.

*The image shown is a conceptual rendering provided for illustrative purposes only.

WHY ROUNDABOUTS?

The video below provides a brief overview of how roundabouts can improve traffic flow and support safer travel for roadway users. 

 

 

PROJECT COST, FUNDING, & SCHEDULE
 

Estimated Cost      $11 Million
FundingState Highway Operation and Protection Program (SHOPP)  

 

Tentative Schedule

YOUR VOICE MATTERS!

Caltrans wants to hear from you! Your feedback will help us understand the needs of the people who use and live near this corridor. 

Click the "Share Your Thoughts" tab at the top of this page. 

PROJECT DEVELOPMENT PROCESS

Project Timeline

live
live

Project Initiation Document (PID)

Current phase

complete
complete

Public Workshop

Date: May 13, 2026
Time: 6:00 PM - 7:00 PM
Platform: Microsoft Teams
Recording: 1A160K Virtual Workshop

Presentation slides: 1A160K_Roundabout at SR-138 & 106th Street East

planned
planned

Project Approval & Environmental Document (PA&ED)

planned
planned

Plans, Specifications, and Estimates (PS&E)

planned
planned

Right of Way

planned
planned

Construction

Caltrans makes every attempt to ensure our documents are accessible. Due to variances between assistive technologies, there may be portions of documents which are not accessible. Where documents cannot be made accessible, we are committed to providing alternative access to the content. Should you need additional assistance, please contact us at (916) 654-2852 or visit https://dot.ca.gov/request-ada-compliant-documents.

Title VI Information

The California Department of Transportation (Caltrans) assures that no person shall, on the basis of race, color, or national origin - including Limited English Proficiency (Title VI of the Civil Rights Act of 1964), be excluded from participation in, be denied the benefits of, or be otherwise subjected to discrimination under any program or activity within Caltrans. Additionally, the Civil Rights Restoration Act of 1987 Amended the Title VI statute to extend coverage of Title VI to include all programs or activities of “Federal-aid recipients” whether those operations are federally funded or not.
 

Title VI Brochures
Title VI brochures in various languages